2021知到答案 智能电网大数据 最新智慧树满分章节测试答案

第一章 单元测试

1、单选题:
Smart Grid is the inevitable choice for the development of ( ) and () .
选项:
A:Science and technology; Natural Environment

B:Power Grid Technology; Natural environment

C:Power Grid Technology; Social economy

D:Power Grid Technology; Natural Environment

答案: 【Power Grid Technology; Social economy
】

2、单选题:
The main technical fields of intelligent power generation are ( ) .
选项:
A:New Energy; Clean Energy; Large Capacity Energy Storage Application

B:Conventional Energy; Renewable Energy; Clean Energy

C:Renewable Energy; New Energy; Large Capacity Energy Storage Application

D:Conventional Energy; Renewable Energy

答案: 【Conventional Energy; Renewable Energy; Clean Energy
】

3、多选题:
Regarding the research methods of big data, the following statement are ture ( ).
选项:
A:Interpretation of results

B:Data collection and multi-source data fusion

C:Build scenario extraction use cases

D:Data Analysis

E:Establishment of physical or mathematical models based on mechanisms

答案: 【Interpretation of results
;Data collection and multi-source data fusion
;Build scenario extraction use cases
;Data Analysis
】

4、多选题:
The following statement about big data are true ( ).
选项:
A:Mathematics as the thinking frame of solid system for big data model

B:Big Data is the medium and means of reconciling the human spirit and the physical world

C:Big Data is suitable for understanding statistical law and chaos law

D:Mathematics provides a theoretical tool for data processing of big data

E:Big Data research requires modeling

答案: 【Mathematics as the thinking frame of solid system for big data model
;Big Data is the medium and means of reconciling the human spirit and the physical world
;Big Data is suitable for understanding statistical law and chaos law
;Mathematics provides a theoretical tool for data processing of big data
】

5、多选题:
Specific Application Directions of power grid development planning include ( ) .
选项:
A:Analysis of influencing factors of power grid reliability

B:Data Storage
C:Load modeling
D:Load forecasting
E:Analysis of electric vehicle charging demand
答案: 【Analysis of influencing factors of power grid reliability
;Load modeling;Load forecasting;Analysis of electric vehicle charging demand】

第二章 单元测试

1、单选题:
The ultimate goal of smart grid is to build a panoramic real-time system covering the whole production process, including ( ) and other links.
选项:
A:Generation and transmission of electricity, conversion and distribution of electricity, electricity and dispatching of electricity

B:Electricity and dispatching of electricity

C:Conversion and distribution of electricity

D:Generation and transmission of electricity

答案: 【Generation and transmission of electricity, conversion and distribution of electricity, electricity and dispatching of electricity
】

2、单选题:
Regarding the factors that affect the reliability of the distribution network, the following is true ( ) .
选项:
A:Power Grid structure, equipment quality, load level, automation level, the level of Operation Management

B:Load level, automation level

C:The level of Operation Management

D:Power Grid structure, equipment quality

答案: 【Power Grid structure, equipment quality, load level, automation level, the level of Operation Management
】

3、单选题:
State Grid Corporation of China began to develop and build enterprise-class big data platform. The Year of the pilot study of big data application was ( ) .
选项:
A:2015

B:2017

C:2014
D:2016
答案: 【2014】

4、多选题:
About Smart Grid big data application prospects, the following are true ( ) .
选项:
A:Improving grid security and reliability of power supply

B:Improving the economy of grid operation

C:Improving smart grid services to consumers and society

D:Enhancing the capacity of the grid to absorb new energy sources

E:Expanding access to grid data

答案: 【Improving grid security and reliability of power supply
;Improving the economy of grid operation
;Improving smart grid services to consumers and society
;Enhancing the capacity of the grid to absorb new energy sources
】

5、多选题:
The challenges to smart grid big data,the following are true ( ) .
选项:
A:Difficulties in obtaining quality data

B:Lack of systematic methodology and industry standard specifications

C:There is no consensus on big data

D:Research on the method of talent team construction and the need of joint mechanism of tackling key problems

E:Broad Range of disciplines and high level of technical complexity

答案: 【Difficulties in obtaining quality data
;Lack of systematic methodology and industry standard specifications
;There is no consensus on big data
;Research on the method of talent team construction and the need of joint mechanism of tackling key problems
;Broad Range of disciplines and high level of technical complexity
】

* 本部分为付费内容,您已获得阅读权限

第三章 单元测试

1、单选题:
The correct source of load forecasting data is ( ) .
选项:
A:Power Generation Information Acquisition System; Power consumption information acquisition system; Dispatching control system

B:Power Generation Information acquisition system; Distribution automation system; Dispatching control system

C:Electrical information acquisition system; Distribution automation system; Dispatching control system

D:Power Generation Information Acquisition System; Power consumption information acquisition system; Distribution automation system

答案: 【Electrical information acquisition system; Distribution automation system; Dispatching control system
】

2、单选题:
the traditional approach to grid operational risk assessment,the following is true ( ) .
选项:
A:Qualitative Analysis, probabilistic analysis, status Assessment

B:Qualitative Analysis
C:probabilistic analysis

D:Status Assessment
答案: 【Qualitative Analysis, probabilistic analysis, status Assessment
】

3、单选题:
According to the service object, the smart grid big data application focus area is divided into ( ) .
选项:
A:Grid Operation and Development

B:Society and government

C:Electricity consumers

D:Grid Operation and Development, electricity consumers, society and government

答案: 【Grid Operation and Development, electricity consumers, society and government
】

4、多选题:
Big Data Technology can be applied to optimize the operation of power grid, analysis of operational risks and abnormal power consumption, including ( ) .
选项:
A:Distribution Network Risk Assessment

B:Intelligent alarm for electric power dispatching control

C:Refined management of technical line loss

D:Detection of non-technical line losses

E:Assessment of grid operation time for WAMS

答案: 【Distribution Network Risk Assessment
;Intelligent alarm for electric power dispatching control
;Refined management of technical line loss
;Detection of non-technical line losses
;Assessment of grid operation time for WAMS
】

5、多选题:
About the user service optimization and the promotion concrete application, the true are ( ) .
选项:
A:Supplementary Analysis of Industry Expansion report

B:Operation of electric vehicle charging facilities

C:Interacting with users

D:Management of power failure

E:Optimization of payment channels

答案: 【Supplementary Analysis of Industry Expansion report
;Operation of electric vehicle charging facilities
;Interacting with users
;Management of power failure
;Optimization of payment channels
】

第四章 单元测试

1、单选题:
The collection of big data in smart grid is divided into which ( ) .
选项:
A:Flow data acquisition, manual acquisition, database acquisition

B:Manual collection, database collection, file collection

C:Flow data collection, manual collection, file collection

D:Flow data acquisition, database acquisition, file Acquisition

答案: 【Flow data acquisition, database acquisition, file Acquisition
】

2、单选题:
Of the following statements about Python, the correct one is ( ) .
选项:
A:A widely used high-level, general-purpose, interpretive dynamic programming language that provides a rich library of algorithms

B:A commercial mathematical software for Algorithm Development, data visualization, data analysis, and numerical computation

C:An open source statistical analysis software, provides a wealth of classical statistical analysis algorithms and mapping technology

D:A distributed real-time computing system

答案: 【A widely used high-level, general-purpose, interpretive dynamic programming language that provides a rich library of algorithms
】

3、单选题:
Of the following categories of ML methods, the correct one is ( ) .
选项:
A:Semi supervised learning

B:Supervised learning, unsupervised learning, semi supervised learning, enhancing learning

C:Enhancing learning

D:Supervised learning and unsupervised learning

答案: 【Supervised learning, unsupervised learning, semi supervised learning, enhancing learning
】

4、多选题:
Some of the typical techniques for data acquisition are ( ) .
选项:
A:Flume

B:Kettle

C:HDFS

D:Sqoop

E:Hive

答案: 【Flume
;Kettle
;Sqoop
】

5、多选题:
In the following application scenario about Matlab, the correct statement is ( ) .
选项:
A:Data cleaning for Small Data Volumes

B:Provide a lightweight parallel computing library

C:Algorithm Research on Small Data Volume

D:Development of prototype system

E:Exploratory analysis of data

答案: 【Provide a lightweight parallel computing library
;Algorithm Research on Small Data Volume
;Development of prototype system
】

第五章 单元测试

1、单选题:
Which layers ( ) are included in the smart grid big data application hierarchy based on the same data model.
选项:
A:Source Data Layer, synchronization layer, component layer, unification layer, display layer

B:Source Data Layer, synchronization layer, component layer, unification layer, business layer

C:Source Data Layer, synchronization layer, component layer, business layer, display layer

D:Source Data Layer, synchronization layer, unified layer, business layer, display layer

答案: 【Source Data Layer, synchronization layer, unified layer, business layer, display layer
】

2、单选题:
The application research of big data in smart grid is a systematic project, which involves ( ) .
选项:
A:Platform Construction, data collection, management, data aggregation and integration Analytical Mining

B:Platform Construction, data collection and management

C:Analytical Mining

D:Data aggregation and integration

答案: 【Platform Construction, data collection, management, data aggregation and integration Analytical Mining
】

3、单选题:

The smart grid big data analysis program mainly includes () main steps.
选项:
A:

five

B:

six

C:

three

D:

four

答案: 【

six

】

4、多选题:
Which of the following options belong to the platform construction development implementation module ( ) .
选项:
A:Testing and deployment

B:Functional Modules and Interface Development

C:Framework Building

D:Integrated Development

E:Component Development

答案: 【Testing and deployment
;Functional Modules and Interface Development
;Framework Building
;Integrated Development
;Component Development
】

5、多选题:
Which of the following options belong to the platform construction scheme design module ( ) .
选项:
A:Platform functionality and capability design

B:Overall architectural design

C:Platform Service layer design

D:Platform data layer design

E:Platform component layer design

答案: 【Platform functionality and capability design
;Overall architectural design
;Platform Service layer design
;Platform data layer design
;Platform component layer design
】

第六章 单元测试

1、单选题:
The overload time sample set, where the percentage of the training set is ( ) .
选项:
A:85%
B:95%
C:90%

D:80%

答案: 【90%
】

2、单选题:
Equipment Accident Association Feature Selection, according to the type of different, choose from the following aspects of the association feature ( ) .
选项:
A:Equipment characteristics; dynamic characteristics; associated characteristics

B:Equipment Feature; dynamic feature; time series feature

C:Dynamic feature; time series feature; associated feature

D:Equipment Feature; time series feature; Associated feature

答案: 【Equipment Feature; time series feature; Associated feature
】

3、单选题:
At present, the distribution transformer area overload control method is ( ) .
选项:
A:In-the-event monitoring and post-event processing

B:Pre-prediction and post-event processing

C:Pre-prediction and pre-monitoring

D:The anticipation and handling of events

答案: 【In-the-event monitoring and post-event processing
】

4、多选题:
The following statement is correct about the research method of identifying the unstable fault of Large Power Grid ( ).
选项:
A:Extended boundary method based on SVM

B:Sample set selection method based on time window

C:Fast judging stability method based on SVM

D:Feature extraction based on static physical quantity

E:Feature extraction based on dynamic physical quantity

答案: 【Extended boundary method based on SVM
;Sample set selection method based on time window
;Fast judging stability method based on SVM
;Feature extraction based on static physical quantity
】

5、多选题:
Based on the big data to carry out the reliability analysis method of protection equipment operation, the following statement is correct ( ) .
选项:
A:Establishment of standard data model for the description of protective equipment

B:Reliability analysis of protective equipment

C:Economic Analysis of protective equipment

D:Cluster analysis of family types of protective equipment

E:Data Extraction

答案: 【Establishment of standard data model for the description of protective equipment
;Reliability analysis of protective equipment
;Cluster analysis of family types of protective equipment
;Data Extraction
】

第七章 单元测试

1、多选题:
For the Power Network real-time state acquisition and full-range online sensing provides means and media is ( ) .
选项:
A:Big data technology

B:Power Information and communication networks

C:Intelligent sensing technology

D:Cloud computing

E:Intelligent algorithms for deep learning

答案: 【Power Information and communication networks
;Intelligent sensing technology
】

2、单选题:
The future development of electrical intelligence is based on technologies such as ( ) .
选项:
A:Internet of things
B:Big Data and deep learning
C:Cloud computing

D:Internet of things, cloud computing, big data and deep learning

答案: 【Internet of things, cloud computing, big data and deep learning
】

3、多选题:
For the power grid data real-time analysis and processing tools are ( ) .
选项:
A:Power information and communication networks

B:Cloud computing
C:Big data technology
D:Intelligent sensing technology

E:Intelligent algorithms for deep learning

答案: 【Cloud computing;Big data technology】

4、多选题:
What changed the decision-making process of power grid business from manual to machine intelligence-aided decision-making was ( ) .
选项:
A:Intelligent sensing technology
B:Deep Learning Intelligence Algorithm

C:The accumulation of massive historical data
D:Big Data Technology
E:Cloud computing
答案: 【The accumulation of massive historical data;Big Data Technology】

内容查看
查看价格5 元
点点赞赏,手留余香 给TA打赏

AI创作

评论0

请先
  • u******* 登录了本站
  • 游客 下载了资源 2018年海南公务员考试《申论》真题及答案
  • u******* 登录了本站
  • u******* 加入了本站
  • 游客 下载了资源 2015年425公务员联考《申论》(海南卷)真题及参考答案
  • 游客 下载了资源 2006年海南省公务员考试《申论》真题及参考答案
  • u******* 下载了资源 2026年秋江苏开放大学学前游戏论060525形考作业2答案
  • 游客 下载了资源 2011年424公务员联考《行测》答案及解析(宁夏、贵州、四川、福建、黑龙江、湖北、山西、重庆、辽宁、海南、江西、天津、陕西、云南、广西、山东、湖南)
  • 游客 下载了资源 2019年420联考《申论》真题(海南县级卷)及参考答案
  • u******* 登录了本站
  • u******* 登录了本站
  • u******* 登录了本站
  • 1******* 投稿收入增加0.8块钱
  • u******* 购买了资源 因相邻市场发现了新冠肺炎确诊患者,某社区被划定为疫情高风险地区,紧急实施封闭式管理。
  • u******* 登录了本站
  • u******* 下载了资源 2026年春江苏开放大学商务谈判实务050278计分作业2:【课程实训3】视频案例分析
点击浏览器地址栏的⭐图标收藏本页
需要代写作业的扫码加微信
显示验证码

社交账号快速登录

微信扫一扫关注
如已关注,请回复“登录”二字获取验证码